Our crew removed the previous epoxy quartz coating, shot blasted the floor, and installed over 3,050 square feet of resinous flooring. The floor had to need little maintenance, withstand locker-room traffic, and, with a swimming pool in the building, be highly chemical and slip resistant. We chose Dur-A-Flex Accelera C for its non-slip surface, durability and chemical resistance; its low odor and fast cure mattered because swim practice continued nearby throughout the installation.
Access was an initial challenge, with narrow passages and sharp turns in one locker room, but the crew made up the lost time through coordinated teamwork. The result was a seamless floor finished on time and on budget.