Projects and case studies
Structure type, scope, system and schedule for recent CRI jobs, many of them in facilities that stayed open during the work.
Case studies
Scope, system and how it was built

Failed floor replacement, NW salsa facility
An epoxy floor installed by another contractor delaminated almost immediately. CRI removed it and installed BASF Ucrete BC6 in three phases while the plant kept producing.
GC: Poe Construction

VA Puget Sound Health Care, operating rooms
New seamless floors in operating and X-ray rooms, installed one room at a time with low-VOC products so the rest of the surgical wing kept operating.
GC: D Square Construction

Elysian Brewing, Capitol Hill
Two floors in one remodel: a urethane mortar system in the brewing and kitchen areas, and ground and sealed concrete in the upper and lower dining rooms.
GC: Mallet Construction

Explorer Middle School locker rooms
Old epoxy quartz removed and 3,050+ square feet of slip- and chemical-resistant seamless flooring installed while swim practice continued next door.

Seafood processor, phase one
After years of in-house repairs, a nonporous floor built for wet processing, thermal shock and washdown.

Harbor Steps Apartments
1,400+ square feet of 800-grit polished concrete with extra aggregate exposure.

B’s Po Boy
A self-leveling topping with walnut integral color and exposed pea gravel, polished to a matte finish.
Portfolio
More completed work
Polishing and resinous flooring jobs from CRI’s portfolio across Washington, Oregon, California and Alaska.

Kodiak High School
Kodiak, AK
Photo: Ken Graham Photography

Tech Facility
Seattle, WA

Wildfin American Grill
Vancouver, WA

Warehouse Epoxy
Seattle, WA

Food Processor
Woodinville, WA

Cucina Fresca
Seattle, WA

Food Processing Facility
Boardman, OR

Food Processing Facility
Santa Rosa, CA